Companies and Plants

IIC For Steel Plants Management Company

IIC was established in 2010 and acquired its first plant in Alexandria in 2011 with a designed capacity of 300,000 tons/yr steel Wire Rods; the plant was recently rehabilitated and commenced its operations in 2014. In 2016 IIC Beni-suef plant started operating with a designed capacity of 830,000 Tons per year, of which 530,000 in steel rebars and 300,000 in steel billets, using Danieli’s .

Alexandria Plant:

IIC has contracted the prominent companies in the field "Danieli" and "Sider Engineering’ to rehabilitate its production facility and add new sizes ranging from 5.5 to 12 mm Wire Rods. Moreover, a new rebar rolling facility is now operational, designed to produce rebar sizes ranging from 16.0mm to 32.0mm considering the maximum utilization of the existing equipment. 

Location 20 km, Alexandria-Cairo Road
Direct  Labor 420 engineers, technicians, and workers.
Designed Capacity 300,000 tons/yr steel Wire Rods and Rebars


 





 


 


Beni Suef Plant:

Beni Suef was chosen as an ideal location for this project due to the economic readiness of the area, as it is Upper Egypt's gate to development. The plant is the first of its kind in the Middle East and Africa, and only the 3rd in the world adopting the latest proven green technology by Danieli in the steel industry. It uses level 3 automation which is considered the latest proven technology currently available worldwide.

This technology depends on 100% recycled scrap, reduces 30% less emissions, and saves approximately 60% of the energy required. Egyptian Steel is the sole provider of green steel in the region. Beni Suef was chosen as an ideal location for this project due to the economic readiness of the area, as it is Upper Egypt’s gate to development. Beni Suef plant will support the development plans in this area. 

 

Location Heavy industries zone, Beni Suef
Direct  Labor 700 engineers and technicians.
Designed Capacity  530,000 tons/yr steel Rebars -  830,000 tons/yr steel Billets